The job included for the completed installation of 400 ton of structural steel support frame installed prior to the erection of the tank and mechanical portion. The job was the #5 Waste Water Thickener Project at Inco. The client supplied his own material in which Quality Tank completed the erection of the components on site in a 13 week construction window. The tank diameter was 100' X 16' high.